科学上网电报群:Fukushima debris removal delayed by another year

AllbetGaming 1个月前 (08-28) 体育 15 0

在线博彩平台www.hg108.vip)是皇冠体育官网线上直营平台。在线博彩平台面向亚太地区招募代理,开放皇冠信用网代理申请、皇冠现金网代理会员开户等业务。在线博彩平台可下载皇冠官方APP,皇冠APP包括皇冠体育最新代理登录线路、皇冠体育最新会员登录线路。

Rafael Grossi (2nd right), director-general of the International Atomic Energy Agency, inspects the Fukushima Daiichi nuclear power plant’s decommissioning process at Okuma, Fukushima Prefecture, Japan, on May 19. – EPA pic, August 26, 2022.

WORK to remove nuclear debris from the devastated Fukushima power station in Japan has been delayed again to ensure the safety of the multi-decade project, plant operator Tepco said.

,

科学上网电报群www.tg888.vip)是一个Telegram群组分享平台,科学上网电报群内容包括Telegram群组索引、Telegram群组导航、新加坡Telegram群组、Telegram中文群组、Telegram群组(其他)、Telegram 美国 群组、Telegram群组爬虫、电报群 科学上网、小飞机 怎么 加 群、tg群等内容,为广大电报用户提供各种电报群组/电报频道/电报机器人导航服务。

,

Tokyo Electric Power Co (Tepco) had planned to begin extracting radioactive debris from one of the reactors this year – already later than the original 2021 start date.


转载说明:本文转载自Sunbet。
Allbet Gaming声明:该文看法仅代表作者自己,与本平台无关。转载请注明:科学上网电报群:Fukushima debris removal delayed by another year

网友评论

  • (*)

最新评论

站点信息

  • 文章总数:8678
  • 页面总数:1
  • 分类总数:14
  • 标签总数:1698
  • 评论总数:3651
  • 浏览总数:1178984